Solar energy glossary
Plain-English definitions of the terms you will see on this site and in quotes from installers.
- SEG (Smart Export Guarantee)
- A UK government scheme that requires licensed energy suppliers to pay you for electricity you export to the grid from renewable sources like solar panels.
- Export tariff
- The rate your supplier pays for each unit (kWh) of electricity you send back to the grid. Typical rates range from 8p to 15p per kWh.
- kWh (kilowatt hour)
- A unit of energy. One kWh is the energy used by a 1,000-watt appliance running for one hour. Your electricity bill is priced per kWh.
- kWp (kilowatt peak)
- The maximum output of a solar panel or system under ideal lab conditions. A 4kWp system has panels rated at 4,000 watts total peak.
- Self-consumption
- The share of your solar electricity you use directly in your home instead of exporting it. Typically 30-50% without a battery, 60-80% with one.
- Grid arbitrage
- Using a battery to buy cheap off-peak electricity (around 7p/kWh) and use it during peak hours (around 28p/kWh), profiting from the price difference.
- Round-trip efficiency (RTE)
- The percentage of electricity you get back out of a battery compared to what you put in. A typical home battery has an RTE of 85-90%.
- MCS (Microgeneration Certification Scheme)
- An industry quality standard for installers of small-scale renewables. You need an MCS-certified installation to qualify for SEG payments.
- RECC (Renewable Energy Consumer Code)
- A consumer protection code that sets standards for how renewable energy products are sold. RECC membership means the installer follows fair trading practices.
- Smart meter (SMETS2)
- A digital meter that sends automatic readings to your supplier, including how much you export. Required for SEG payments based on actual exports.
- Irradiance
- The amount of solar energy hitting a surface, measured in kWh per square metre per year. Scotland receives roughly 850-1,050 kWh/m2/yr depending on location.
- DNO (Distribution Network Operator)
- The company that owns and maintains the local electricity cables and poles. You may need DNO approval for solar systems above 3.68kW on a single-phase supply.
- G99 application
- A formal application to the DNO for connecting a generation system above 3.68kW (single phase) or 11kW (three phase) to the grid.
- Deemed export
- If you do not have a smart meter, your supplier estimates your exports (typically 50% of generation) rather than measuring them. This usually pays less than actual metered export.
- Feed-in Tariff (FiT)
- The predecessor to the SEG, closed to new applicants since March 2019. Systems registered under FiT continue to receive their agreed rate for 20-25 years.
- Degradation
- Solar panels lose a small amount of output each year — typically 0.4-0.5%. After 25 years, most panels still produce over 85% of their original output. Batteries degrade faster, losing roughly 1-2% capacity per year.
- TrustMark
- A government-endorsed quality mark for tradespeople. TrustMark registration is required for some incentive schemes and shows the installer meets defined standards.
- EPC (Energy Performance Certificate)
- A rating of your home's energy efficiency (A to G). Solar panels improve your rating. An EPC is required when selling or renting a property.
Reviewed by the Scottish Energy Efficiency technical team — MCS IAA10151 · RECC 00077024 · TrustMark 3559930
Last updated: August 2026
Sources: Home Energy Scotland, Ofgem SEG, MCS, PVGIS (European Commission)